GUIDE 01 · COST PLANNING

What should a construction BOQ include?

A Bill of Quantities (BOQ) organises the work into measurable items. It helps a client understand what is being priced and gives the project team a common reference for comparing quotations.

Useful BOQ components

  • Item description and specification
  • Unit of measurement and estimated quantity
  • Rate and extended amount
  • Drawing or specification reference where available
  • Clarifications, assumptions and exclusions

Check whether the quotation covers excavation, concrete, reinforcement, masonry, plastering, waterproofing, flooring, painting, electrical, plumbing, doors, windows, external works, taxes and site preliminaries. The relevant items depend on the project scope; not every project requires every item.

Compare quotations on the same scope and specification—not only on the final total.

GUIDE 02 · QUOTATION REVIEW

How to compare construction quotations

A low headline price may not represent the lowest final project cost if important work is omitted or specifications differ. Review the commercial and technical basis together.

Questions to ask before accepting

  • Are quantities based on issued drawings or preliminary assumptions?
  • Which cement, steel, concrete, blocks and finish specifications are included?
  • Are transport, loading, wastage, scaffolding and equipment included?
  • Who purchases materials and who is responsible for storage?
  • How are extra items, client changes and quantity variations priced?
  • What are the payment milestones and quotation validity period?

Ask for exclusions and provisional sums to be written clearly. Confirm whether design fees, statutory charges, utility connections, compound works, landscaping, interiors and taxes are part of the offer or separate.

A useful quotation explains what the price includes, what it excludes and what assumptions it relies on.

GUIDE 03 · DESIGN COORDINATION

Why coordinated drawings matter

Architectural, structural and services drawings describe different parts of the same building. If they are developed or revised without coordination, conflicts can appear during construction.

Before work starts, check that

  • The latest drawing revision is identified and shared
  • Dimensions, levels, openings and room layouts are coordinated
  • Structural members and service routes have been reviewed together
  • Electrical and plumbing points reflect the intended room use
  • Interior requirements are considered before relevant civil work is closed

Do not rely on a marketing floor plan or an old PDF for construction. The responsible designer or engineer should issue the appropriate construction information and clarify revisions.

Keep one controlled set of current drawings on site and record changes before execution.

GUIDE 04 · SITE QUALITY

Construction checks worth planning

Quality checks should be planned before the work is covered by the next activity. The inspection method and acceptance criteria must follow the approved design, project specifications and applicable requirements.

Examples of hold points

  • Foundation excavation dimensions and founding conditions
  • Reinforcement, cover, formwork and embedded items before concrete
  • Concrete delivery, placement, compaction and curing records
  • Masonry line, level, bonding and openings
  • Waterproofing substrate preparation, application and testing as specified
  • Services pressure or continuity tests where required
  • Finishes, fixtures and final snagging before handover

These examples are not a universal inspection checklist. Project-specific inspection and test plans should be prepared by the responsible technical team.

Agree who inspects, what evidence is recorded and when work may proceed to the next stage.

GUIDE 05 · MATERIAL SPECIFICATIONS

Specify materials before pricing

Words such as premium, standard or branded are not complete specifications. Clear material descriptions help prevent misunderstandings during procurement and execution.

Record the relevant details

  • Product type, grade, size, thickness or strength class
  • Brand or approved equivalent criteria, if required
  • Finish, colour, pattern and sample approval process
  • Applicable technical data and compliance documents
  • Storage, handling and installation requirements

For structural materials and building systems, selection must follow the approved design and the advice of qualified professionals. Substitutions should be reviewed and approved before purchase or installation.

A written specification is more useful than a brand name alone.

GUIDE 06 · RENOVATION PLANNING

Plan a renovation around the existing building

Renovation differs from new construction because concealed conditions may be discovered only after opening up existing finishes or services. A realistic scope should allow for inspection and agreed procedures when unexpected conditions arise.

Before starting

  • Record existing room dimensions and visible defects
  • Identify structural elements that must not be altered without engineering review
  • Locate electrical, plumbing and drainage routes where possible
  • Decide which areas remain occupied during the work
  • Plan dust, noise, access, protection and debris removal
  • Separate confirmed work from provisional repair allowances

Never cut, remove or modify a structural member based only on appearance. Obtain the required assessment and written direction from the responsible structural professional.

A careful existing-condition review reduces surprises, but cannot eliminate every concealed-condition risk.

02 — HAVE A PROJECT QUESTION?

Get advice based
on your actual brief.

Share your drawings, site details and project priorities. UiK can review the enquiry and clarify what information is needed to discuss scope and estimation.

Ask about your project ↗
CallWhatsApp